Project: Mulroy Bay Bridge

Contractor: BAM

Client: Donegal County Council

Designer: RPS-MCOS

Commencement: 2007

Completion: 2009

Value: £1,250,000

Project description:

We were contracted to carry out all reinforced concrete works associated with the construction of a high level multi-span bridge across Mulroy Bay sea estuary in Co. Donegal.

The bridge is 350 meters long and has a clearance height of 20 meters. The structure required over 6000m3 of concrete and over 1000 tonnes of reinforcement steel.

Mulroy Bay Bridge - image 1