Mulroy Bay Bridge
Contractor: BAM
Client: Donegal County Council
Designer: RPS-MCOS
Commencement: 2007
Completion: 2009
Value: £1,250,000
Project description:
We were contracted to carry out all reinforced concrete works associated with the construction of a high level multi-span bridge across Mulroy Bay sea estuary in Co. Donegal.
The bridge is 350 meters long and has a clearance height of 20 meters. The structure required over 6000m3 of concrete and over 1000 tonnes of reinforcement steel.
